WulverPermanent link to Wulver
Wulver is NJIT's newest cluster, which went into production in early 2024. To get started with Wulver, please check the details in get started on Wulver
Specifications:Permanent link to Specifications:
| Specification | General | Bigmem | GPU |
|---|---|---|---|
| Partition | general |
bigmem |
gpu |
| Nodes | 100 | 2 | 25 |
| CPU Type | AMD EPYC 7753 | AMD EPYC 7753 | AMD EPYC 7713 |
| CPU Speed (GHZ) | 2.45 | 2.45 | 2.0 |
| CPUs/Socket | 64 | 64 | 64 |
| Sockets/Node | 2 | 2 | 2 |
| RAM/Node (GB) | 512 | 2048 | 512 |
| GPU Type | - | - | nVIDIA A100 |
| GPUs/Node | - | - | 4 |
| GPU Memory (GB) | - | - | 80 |
| Total CPUs | 12800 | 256 | 3200 |
| Total RAM (TB) | 50 | 4 | 12.5 |
| Total SUs/year | 112128000 | 2242560 | 28032000 |
| Peak Performance (TFLOPs) | 501.76 | 10.035 | 1072.4 |
| HPL (TFLOPs/Node) | - | - | - |
- 100 GB High throughput/low latency Infiniband network
- Arcastream Storage
- Parallel filesystem allowing multiple read/write operations
- Max performance 20 GB/s
- Hierarchical storage; NVME scratch, SAS, Cloud
- User transparent transfer from high-speed to medium to archive storage
- 1 PB total storage
- Virtualized Support and login nodes
- Management and deployment overseen by NJIT:
- Nvidia Bright Cluster Manager
- X-ISS system administration
- SLURM scheduler with full support
- InfiniBand support via Dell or directly from Mellanox
- Will be deployed in the Databank data center in Piscataway